S No |
PRJECT/ CONTRACT TITLE DESCRIPTION OF WORK |
Client |
1 |
Maintenance Services |
U G C |
2 |
Maintenance Services |
MODECOR |
3 |
Construction of Zulf-Deck (B1-3008) Steel Reinforced Concrete Block Support |
STAR-ERRAM |
4 |
Fire Proofing Structural Steel At AR-RAZI II, III,IV |
SABIC |
5 |
Civil, FRP Piping, Electrical Instrumentation for MARAFIQ Line-3” & 6” |
AMINAT |
6 |
Concrete basim, 24” Piping for Water lines, Pipe Supports, Electrical work, Erection of Cooling Tower, Testing & Commissioning- Jeddeh-9 Cells |
KAUST/Aramco |
7 |
Foundation, Piping for Water lines Pipe supports, Electrical work, Erection of Cooling Tower, Testing & Commissioning- Dammam- 3 Cell |
ZAMIL/Masdar |
8 |
Construction of Container Yard SSD-1 Fency Installation, asphalting, Construction of Cluvert, Installation of street Light, Fabrication Installation of Utility Main LINE |
TASNEE |
9 |
Ibn Zahar Fence Line Project/Security System |
Ibn Zahar |
10 |
Climate Control System for Flex Storage Bldg. |
APC |
11 |
Design/ Const of foundation for furnace propane vesels |
MIS |
12 |
Fabrication of Piping Supports |
Azmeel/ Sidem |
13 |
Shifting of Machineries and Equipment |
APC |
14 |
Civil & Electrical Work |
APC |
15 |
Fire Hose Reel Cabinet Re-location |
APC |
16 |
Fabrication & Installation of Hand Rails inside the plant |
APC |
17 |
Installation of Scaffolding for Shutdown |
DWI |
18 |
Installation of cooling water return line |
Mada |
19 |
Installation of pneumatic air line work-Machines |
Mada |
20 |
Installation of pneumatic air line work- Labortory |
Mada |
21 |
Interior Works- Civil & Electrical |
KIMS |
22 |
Fabrication & Piping for CO2 Cylinders & Fab.ofshelter |
Mada |
23 |
Relocate silo air knocker control |
SODA |
24 |
Installation of Magflowmeter and cable laying |
SODA |
25 |
Service- Installation of Neumann System |
CHEMANOL |
26 |
Alignment of plates and foundation for crane |
MIS Arabia |
27 |
Mechanical Work for Steel Plant, Piping for Gas & Water, Supports, Electrical for Plant Equipment. |
UGS |
28 |
Underground Pipe Line Works for JEC Company |
JEC |
29 |
Piping works for fabrication plant |
MIS Arabia |
30 |
Casting of Concrete blocks |
MIS Arabia |
31 |
Supply of Equipments |
SAMSUNG |
32 |
Supply and installation of conveyor belts |
SABAYEK |
33 |
Fabrication and Installation of galvanized Grating |
AL- RAZI |
34 |
Supply Equipments |
Jan DE Nul |
35 |
Flux & wire Store Climate Control System |
APC |
36 |
Villas for Mr. Mohd. AL- Buainain |
Private |
37 |
Executive Camp Construction for AGT |
Private |
38 |
Installation of Fire Systems including the Civil Work |
APC |
39 |
Painting Works at X-Ray Building of the Plant |
APC |
40 |
Fabrication of Bitumen Storage Tank |
DWI |
41 |
Base Foundation , Wall and erection of Bitumen Storage Tank |
DWI |
42 |
Maintenance Work |
Cooper Heat |
43 |
Pilling concrete pockets for Shredder conveyer |
DWI |
44 |
Reinforced concrete for shredder and densifer at DWI site |
DWI |
45 |
Fabrication and installation of Pipe Line |
DWI |
46 |
Construction of Villa – AHMED faisal |
Private |
47 |
Renovation of Villa- Mohammed |
Private |
48 |
Construction of Fabrication Shop |
Private |
49 |
Fabrication of Steel box 8 Nos |
DWI |
50 |
Fabrication and Installation of Duct for Tank No.6 |
DWI |
51 |
Installation of Sand Dryer |
DWI |
52 |
Construction of concrete slab |
DWI |
53 |
Laying Pipes including cable casing |
DWI |
54 |
Laying Power Cable |
DWI |
55 |
Fabrication of steel platform including Ducting for mixer/ electrical |
DWI |
56 |
Shutdown Service |
DWI |
57 |
Fabrication of steel storage tank |
DWI |
58 |
Maintenance Services |
SIEMENS |
59 |
Way between Production and warehouse Building |
DWI |
60 |
Construction of pit |
DWI |
61 |
Fabrication of steel bldg. |
DWI |
62 |
Supply of Equipments |
SIEMENS |
63 |
Supply & Installation of Fitter |
SIEMENS |
64 |
Extension of warehouse & Post Office |
Navel Base |
65 |
Supply Equipments |
SIEMENS |
66 |
Supply of Manpower |
SIEMENS |
67 |
Power supply for construction site office |
|
68 |
Project support Service/ Various/ CIVIL/ Ele/Mech. / Inst. Works, Equipment supply |
DOOSAN |
69 |
Fabrication Offices |
TRUBA ARABIA |
70 |
Fabrication of Steel Building |
DWI |
71 |
Construction of six mosques |
NAVEL BASE |
72 |
Fabrication of & Installation of platform for mixer |
DWI |
73 |
Construction & modification of offices |
UGS |
74 |
Construction of offices |
UGS |
75 |
Fabrication & Installation of Doors |
UGS |
76 |
Construction of toilets |
UGS |
77 |
Construction of offices for dispatch Manager |
UGS |
78 |
Fabrication of sheds for chiller units |
UGS |
79 |
Renovation of King Abdul Aziz Air Port |
Navel Base |
80 |
Fabrication of jacketed pipe for storage tank |
DWI |
81 |
Installation of Pump and accessories |
DWI |
82 |
Grading and Leveling |
BELLELI SAUDI |
83 |
Site facility/ fencing / fab. Of Steel building |
Al Gosaibi Service |
84 |
Shifting of materials |
BELLELI SAUDI |
85 |
Grading & leveling of the area |
BELLELI SAUDI |
86 |
Dismantling and erection of new pump with accessories |
DWI |
87 |
Grading, Filling & Construction of Road |
BELLELI SAUDI |
88 |
Maintenance Service- Shutdown |
BELLELI SAUDI |
89 |
Supply of Equipment |
BELLELI SAUDI |